
09ENG8: THE ENERGICELL COMPANY
ENG8 International LIMITED, registered in Gibraltar under company number 120001. Registered office address: Nº 2, Irish Town, Gibraltar. Website: https://eng8.energy/
Private Investors still have the opportunity to invest in this ENG8 seed round. The next round will start once the first commercial sales of electricity has started.
Latest updates:
2026 06 04: Updated ENG8 Investor Presentation June 2026:
ENG8 Investor Presentation 2026 V1.5.pdf
2026 05 25: Updated one-pager Exec summery May 2026:
ENG8 One Pager Exec Summary May 2026.pdf
2026 05 07: ENG8 won a competition to make a specific EnergiCell pitch to Prio, the largest fuel distributor in Portugal. They made the presentation the 7th May 2026. Click below to see the presentation:
ENG8 -Prio Pitch 7th May 2026 V1.1 Final.pdf
2026 03 31: Update ENG8- A Breakthrough in Clean Energy with its EnergyCell Technology
ENG8 update 31 march 2026.docx
2026 01 30: Rewarding Investment with a SOCIAL focus.
If you want your investment not only to be financially rewarding but also have a positive social impact for those who need it, watch the video below. Up to minute 18 is product information, after that financial and social impact.
March 24-2026: ENG8 demonstrates 100 Kw generator at Bergamo European cold Fusion Conference. Contact us for details, an explaining poster and the latest updates.
Message us for the full update or Exposition guidelines with the latest technical updates.
As institutional investments are expected to complete soon, it might not be a bad idea to invest now in this technology that will change the way the world will generate energy. Where ENG8 has been accepted to be a front runner at the ICCF26 conference in Japan, it is still very much undervalued. You can still enjoy the current low share price. Contact us for more information.
Private Investors still have the opportunity to invest in this ENG8 seed round. After completion of expected larger Institutional investments soon, this seed round will close for 6 12 months + for private investors, enabling ENG8 to focus on further product developments and the first commercial industrial LENR installation early 2026.
More links:
ENG8 presented the EnergiCells at the ICCF26 in Japan. Click here to see the short video:
ENG8 presentacion at ICCF26 in Japan.
Email us for the full presentation in Powerpoint.
ENG8 International was formed in July 2020 to acquire and develop catalysed fusion solutions to supply humanity with a pure, clean abundant energy with love and compassion. ENG8 has been developing catalysed fusion/(low energy nuclear reactions (LENR) technology known as the EnergiCell® which is able to produce emission free, cost-effective energy. EnergiCells generate thermal, electrical and chemical (HHO) energy. Today, ENG8 has a team of 30 plus scientists and engineers with decades of experience working on LENR/catalysed fusion technologies and power generation. ENG8 is developing a range of practical, cost-effective, catalyst fusion reactors, EnergiCells, which have been independently validated. Specialists have confirmed the results of the latest independent validation of its EnergiCell®, conducted by world-renowned LENR expert Dr Jean-Paul Biberian, confirming that the system is self-powering and export net electricity. The team at ENG8 is currently working to finish a 100KW (minimum) economically viable industrial heater product. The system will feature an automated operating system with in-built AI system optimisation that will accelerate the speed of development.
Investors now have the opportunity to contribute to ENG8 in order to accelerate further development and commercial deployment with rewardable investments.
On top of the independent validation by worldwide respected nuclear scientist Dr. Jean-Paul Biberian of the self-powering EnergiCell, below you can watch a recording of EnergiCell (10 KW) from the laboratory in Portugal in December 2024. It´s shows a COP-range (Q-value) from 4 to 6. Meaning 4 to 6 times more energy going out than is coming in with this catalysed fusion reactor. By now, developments have proceded. Read the latest updates.
Keep in mind: At the end of the day Everything starts with Energy, everywhere.
In short development since 03/2023:
ENG8 International Ltd.
The self-powering LENR (low energy nuclear reactions) EnergiCells have the potential to decentralise energy generation, decarbonise the economy, and slash energy prices using water or damp to fuel. No radiation and no extreme high temperatures needed (like with hot fusion).
- Oct 2025:, Professor Jean-Paul Biberian independently validated one of our EnergiCell systems self-powering for 160 minutes with one-second restart capability which in future can be automated for restart.
- Oct 2025: MVP – 100 kW Thermal Power Plant
Our air/water EnergiCell has achieved a stable COP of ten using low-cost electrodes with operational lifespans of days. The next development stage for this system involves integrating a heat exchanger and compound steam engine (steam expander) targeting 30% thermal-to-electrical conversion efficiency.
In parallel, our Portugal facility is developing the system for creating 200 kW of thermal power. Post-conversion, the MVP will generate electrical power whilst retaining over 100 kW of thermal power in the form of steam at 10 bar for integration into clients' industrial processes.
Based on current supply and equipment costs and preliminary modelling, we are targeting energy generation costs of €15/MWh compared to £60/MWh for oil and gas and £100+ for electricity.
- Oct. 2024 self-powering EnergiCell independently validated by Dr. Jean-Paul Bebirian.
- Oct. 2023 Independently validated.
- IPR protected and patents pending.
- Independent validation Oct 2023 at Culham Innovation Centre, home to the UK’s Atomic Energy Authority, in Oxfordshire. confirming a COP/Q-value of 5, energy in to electricity out.
- Provides direct electricity and heat from various EnergiCells.
- Trademarks ENG8 and EnergiCell registered in the UK
- Fully IP protected.
- Patents and worldwide patent applications are in force.
- First commercial unit to be installed in Portugal in 2026.

1 - 10 kw unit
Above Cop 5, the EnergiCell releases enough energy not only to power itself, but also to dissipate heat and energy, using only water or air as raw material

Small EnergiCell in development

Laboratory Portugal

Mid-size EnergiCell (100 KW)
For more information click on the links below:
FAQ's ENG8 International you find here:
For questions call (+44 (0)2035822970), WhatsApp (+34 696674963) or email us at paul-dopierala@eng8.org, or practiteches@gmail.com
For more interesting investment opportunities visit: